Structure designed to be built
I work with contractors to cut cost and programme risk before it reaches site: cost mitigation, schedule compression, connection de-risking and procurement timing.

Hammersmith Town Hall, London. Temporary works for a steel extension over a live heritage building.
Savings and certainty, before and during the build
- Value engineering and alternative designs: savings without losing performance
- Buildability reviews: a contractor’s-eye check of the design before tender or fabrication, to catch what will be slow, awkward or risky to build
- Design for manufacture and assembly (DfMA): prefabricated, panelised and kit-of-parts structures in timber, steel and precast, with repeatable details and faster erection
- Early contractor involvement (ECI): buildability built in before tender, with fewer variations and RFIs
- Early supplier involvement (ESI): sizes, connections and lead times agreed with fabricators and timber suppliers, so procurement can start early
- Temporary works: propping, shoring and temporary stability during demolition and erection
- Construction sequencing and erection methodology: staged erection sequences and lifting plans the site team can follow
- Site inspections and construction monitoring: inspections at hold points, shop drawing review and PS4
- Defect assessment and remedial design: finding the cause when something goes wrong on site, and designing a practical fix
- Design and build: structural design as part of the contractor’s team on design-and-build projects
New to these terms? DfMA, ECI and ESI explained →
Where this has worked

Hammersmith Town HallSteel connection design and temporary works · London

Milldale Stage 2Repeatable panelised timber system · 16 blocks

Gulf Rise care buildingKit-of-parts CLT with bathroom pods

Soldier of Orange TheatreFully fabricated off site · London

Carrington StreetDetailed steel connection design · London

Kennards Self StorageCLT floor diaphragms on steel · Hastings
Also: Moxy Hotel value engineering (Qualico) · Transpower standard prefabricated building · Reyburn St constructability review
From drawings to site
Pricing a job, or looking for savings on one?
Send me the drawings and I’ll reply within two working days.
